Project Description:

Point repair and surface rehabilitation or full depth repair of the following streets:

Phase II Street Rehab areas:

Main St. - 21st St. to University Ave. (includes Water and Waste water reconstruction)

Ash St. – 18th St. to 15th St.

Mimosa St. – E 18th St. to E 16th St.

W 10th StRailroad Ave to West St.

8th St.Myrtle St. to College St.

Park Ln.Clay St. to Central Dr.

Central Dr. – Park Ln. to Northwest Blvd.

Luther @ Rockcrest

Project Manager: Joel Weaver 948-1300

Engineer: KPA Engineering Bid Date: 9-2-08

We will be receiving bids for this project 9-2-08. Pre-construction is set to begin November 4, 2008, construction will begin on November 10 (on Main Street), and a schedule will be posted soon.


Posted in Current, Streets, Water


2 Responses to “2008 Street Rehabilitation Phase 2”

Cynthia Urban | November 10th, 2008 at 1:47 pm

I live on S Main and 19th Streets. Are there plans for new sidewalks as well (similar to Austin Ave)? They are in very poor condition.


Joel Weaver | November 12th, 2008 at 8:44 am

Cynthia, there will be some new sidewalk installed and also some work on the existing sidewalks.